Saturday, July 31, 2010

July

I welcomed Doug back from his vacation, I mean tour, full of enthusiasm at the prospect of him being well-rested enough to work diligently with the goal of getting his shop moved by the end of the month so that we could finally start throwing less money away on rent.

The room in the basement that will become his shop needed drywall on one wall and the ceiling, plus some remedial work on one of the other walls. I forgot that it always takes him a week or two to get back in gear after a trip of any length. So as of July 20th the ceiling was still not wallboarded. He had to carve away a 2/4 to accomodate all of those wires and provide a place for the wallboard to attach.





And he made a sound deadening box for the heating duct so hopefully we won't hear his machines operating all over the house.



By July 27th he had installed all of the drywall and was preparing to attach a sound deadening second layer of drywall. The Green Glue will created a barrier between the two layers.



Needless to say, we did not get the shop moved by the end of July.